Difference between revisions of "Soundproofing"
Jump to navigation
Jump to search
(Created page with "A shopping list for soundproofing our wall: Numbers are based on an estimate of 30' of wall. They will have to be updated when Chris goes back and measures. * 4 rolls of 32'...") |
|||
Line 1: | Line 1: | ||
− | + | This is a guide to how we soundproofed our space at Bubbly Dynamics. | |
− | + | ==Shopping List== | |
− | * 4 rolls of 32' x 23" fiberglass insulation. Home depot equivalent of this: http://www.menards.com/main/p-2769573-c-19566.htm?tid=-7400819307512094782 | + | Numbers are based on an estimate of 30' of wall. |
− | * 15 * 10' lengths of R1 resilient channel: http://www.homedepot.com/p/Unbranded-1-2-in-x-10-ft-Resilient-Channel-727181/202090341 | + | **4 rolls of 32' x 23" fiberglass insulation. Home depot equivalent of this: http://www.menards.com/main/p-2769573-c-19566.htm?tid=-7400819307512094782 |
− | * Drywall screws | + | **15 * 10' lengths of R1 resilient channel: http://www.homedepot.com/p/Unbranded-1-2-in-x-10-ft-Resilient-Channel-727181/202090341 |
− | * Drywall | + | **Drywall screws |
+ | **Drywall | ||
− | Steps | + | ==Steps== |
− | + | 1. Cut insulation to 8' lengths | |
− | + | ||
− | ** cut insulation away from outlets 3" | + | 2. Install insulation |
− | + | **cut insulation away from outlets 3" | |
− | ** horizontally along the ground, open edge up | + | |
− | ** horizontally every 2' above that | + | 3. Install resilient channel |
− | ** 5 layers of channel total, at 0', 2', 4', 6', and 8' | + | **horizontally along the ground, open edge up |
− | + | **horizontally every 2' above that | |
− | + | **5 layers of channel total, at 0', 2', 4', 6', and 8' | |
+ | |||
+ | 4. Attach drywall to channel | ||
+ | |||
+ | 5. Mud drywall |
Revision as of 20:13, 13 March 2017
This is a guide to how we soundproofed our space at Bubbly Dynamics.
Shopping List
Numbers are based on an estimate of 30' of wall.
- 4 rolls of 32' x 23" fiberglass insulation. Home depot equivalent of this: http://www.menards.com/main/p-2769573-c-19566.htm?tid=-7400819307512094782
- 15 * 10' lengths of R1 resilient channel: http://www.homedepot.com/p/Unbranded-1-2-in-x-10-ft-Resilient-Channel-727181/202090341
- Drywall screws
- Drywall
Steps
1. Cut insulation to 8' lengths
2. Install insulation
- cut insulation away from outlets 3"
3. Install resilient channel
- horizontally along the ground, open edge up
- horizontally every 2' above that
- 5 layers of channel total, at 0', 2', 4', 6', and 8'
4. Attach drywall to channel
5. Mud drywall