Difference between revisions of "Soundproofing"

From sshcWiki
Jump to navigation Jump to search
(Created page with "A shopping list for soundproofing our wall: Numbers are based on an estimate of 30' of wall. They will have to be updated when Chris goes back and measures. * 4 rolls of 32'...")
 
Line 1: Line 1:
A shopping list for soundproofing our wall:
+
This is a guide to how we soundproofed our space at Bubbly Dynamics.
  
Numbers are based on an estimate of 30' of wall. They will have to be updated when Chris goes back and measures.
+
==Shopping List==
  
* 4 rolls of 32' x 23" fiberglass insulation. Home depot equivalent of this: http://www.menards.com/main/p-2769573-c-19566.htm?tid=-7400819307512094782
+
Numbers are based on an estimate of 30' of wall.
* 15 * 10' lengths of R1 resilient channel: http://www.homedepot.com/p/Unbranded-1-2-in-x-10-ft-Resilient-Channel-727181/202090341
+
**4 rolls of 32' x 23" fiberglass insulation. Home depot equivalent of this: http://www.menards.com/main/p-2769573-c-19566.htm?tid=-7400819307512094782
* Drywall screws (which we ostensibly own)
+
**15 * 10' lengths of R1 resilient channel: http://www.homedepot.com/p/Unbranded-1-2-in-x-10-ft-Resilient-Channel-727181/202090341
* Drywall (which we ostensibly own)
+
**Drywall screws
 +
**Drywall
  
Steps:
+
==Steps==
* Cut insulation to 8' lengths
+
1. Cut insulation to 8' lengths
* Install insulation
+
 
** cut insulation away from outlets 3"
+
2. Install insulation
* install resilient channel
+
**cut insulation away from outlets 3"
** horizontally along the ground, open edge up
+
 
** horizontally every 2' above that
+
3. Install resilient channel
** 5 layers of channel total, at 0', 2', 4', 6', and 8'
+
**horizontally along the ground, open edge up
* Attach drywall to that
+
**horizontally every 2' above that
* mud drywall
+
**5 layers of channel total, at 0', 2', 4', 6', and 8'
 +
 
 +
4. Attach drywall to channel
 +
 
 +
5. Mud drywall

Revision as of 20:13, 13 March 2017

This is a guide to how we soundproofed our space at Bubbly Dynamics.

Shopping List

Numbers are based on an estimate of 30' of wall.

Steps

1. Cut insulation to 8' lengths

2. Install insulation

    • cut insulation away from outlets 3"

3. Install resilient channel

    • horizontally along the ground, open edge up
    • horizontally every 2' above that
    • 5 layers of channel total, at 0', 2', 4', 6', and 8'

4. Attach drywall to channel

5. Mud drywall